Thomazo Bridge Reconstruction, post Hurricane Tomas
CMS Construction Services was sub-contracted by Integrated Development and Construction Ltd (IDC), to carry out DIP piling
of the buttresses for the Thomazo bridge, replacing the previous structure which was seriously damaged by Hurricane Tomas.
DIP piling offers a low cost and effective solution to bridge stabilisation.
Ductile Iron Piles (DIP) were specified for the works by the Ministry of Infrastructure, Port Services and Transport, after demonstrations of DIP installation at the Harbor Club Hotel and presentations to Ministry engineers.
CMDB, our Caribbean joint venture company with coastal design engineers Smith Warner International of Jamaica, is currently contacting many of the hotels in the Leeward Islands, to offer their services to rebuild and renovate the many beaches and marine facilities which have been damaged by the recent hurricanes.
Contact us Today
to Secure & Rebuild
Let CMS become a vital contributor to your marine or onshore piling or construction project, a reliable contractor when your problems require trusted, durable solutions and an expert,
quality construction company, for key land and marine security, reclamation and reconstruction work.