fbpx

PROJECTS Sand and More for Glenconner Beach, Soufriere, St. Lucia.

Client:
Project:



Technology:

Sugar Beach, a Vicroy Resort.
CMDB created a new, stabilised beach, with jetty, concrete access
road and supply of sand for re-sanding and beach enhancement,
for Glenconner Beach, Soufriere, St Lucia.
Sand was sourced in Guyana, as this is the only sand type approved by Government.


Our Crane Barge Operation
With ATI, our barge haulage partners, 
we offer our Crane Barge operation, for coastal construction within the region and South America.
CMS Group Moving forward
The CMS Group. moving forward, with Plug&Drive© DIP. Common sense science and technology for the Caribbean and its development.
Approach, Execution and Workmanship
The CMS Group established a regional presence by creating confidence in approach, execution and workmanship, being specialists in contemporary technology.
Making the Change in Regional Construction
There is little doubt that the world has changed and at The CMS Group, we are making the change in Regional Construction smarter with a positive impact.
Re-opening Construction Sites
The CMS Group work in many places throughout the Caribbean. Construction sites, closed due to COVID-19, are slowly reopening with new protocols.
Foundation Piling for St Lucia Distillers
CMSCS has completed the installation of 336 “dry-driven” Ductile Iron Piles for two new Rum Storage Warehouses in Roseau, St Lucia.
Tanker moorings for St Lucia Distillers
CMS is in process of installing two heavy duty mooring bollards on Roseau Beach to improve the safety of mooring molasses tankers delivering to the Distillery.
Emerald Point Groyne TCI

CMDB recently completed the Emerald Point groyne in Providenciales, TCI.  The 600ft long terminal groyne was constructed to prevent coastal erosion of beach assets.  

Salacia House TCI

Salacia House, a beach front property in the Turks and Caicos Islands, required a revetment to reduce coastal erosion and enhanced beach access.

CMS Bathymetric Survey IGY Marina

CMS carried out a Bathymetric Survey for the channel entrance of IGY Marina, Rodney Bay, St Lucia.

Repairs to the RO intake Le Sport

Repairs to the submerged Reverse Osmosis, or 'RO' intake, which supplies seawater to the desalination system at Le Sport Hotel, St Lucia.

Sand and more for Glenconner Beach

Supply of sand for beach enhancement and concrete access road and jetty construction, for Glenconner Beach, Soufriere, St Lucia.

Copyright © 2019, CMS Limited. All Rights Reserved.
website by:
presentimage