CMS installs
all forms of steel, wood and fibreglass piles for marina and jetty projects, using our shallow-water crane barge which carries a variety of piling equipment.
We operate the “Piton Piler” a 50 ft. self-propelled shallow water barge, capable of carrying up to 30 tons of heavy equipment, crane, excavator etc. and most forms of piling equipment. Completely rebuilt in 2014, the barge is a working platform for all types of marine piling. CMS has constructed most of the new docks and jetties, boat lifts and sea defenses in St Lucia, over the past 7 years, including those at The Landings Resort, Marigot Bay, Calabash Cove, Ti Kaye Village and the Pigeon Island National Park.
Leave a Reply