There is little doubt that the world has changed and at The CMS Group, we are making the change in
The CMS Group work in many places throughout the Caribbean. Construction sites, closed due to COVID-19, are slowly reopening with
CMS is in the final stages of completing the installation of 336 “dry-driven” Ductile Iron Piles to an average depth
CMS is in process of installing two heavy duty mooring bollards on Roseau Beach to improve the safety of mooring
CMDB recently completed the Emerald Point groyne in Providenciales, TCI.  The 600ft long terminal groyne was constructed to prevent coastal
Salacia House, a beach front property in the Turks and Caicos Islands, required a revetment to reduce coastal erosion and
CMS specialise in inshore Vinyl Sheet Pile installation to stabilise land/water margins and steel, wood and fibreglass piling for marina
CMS carried out a Bathymetric Survey for the channel entrance of IGY Marina, Rodney Bay, St Lucia.
Repairs to the submerged Reverse Osmosis, or 'RO' intake, which supplies seawater to the desalination system at Le Sport Hotel,
Supply of sand for beach enhancement and concrete access road and jetty construction, for Glenconner Beach, Soufriere, St Lucia.